Lancia Beta Forum
October 04, 2024, 05:56:59 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Looking for Lancia Beta parts: www.lanciabetaparts.co.uk
 
   Home   Help Contact Admin Search Calendar Gallery Articles Login Register  
Pages: 1 ... 14 15 [16]
  Print  
Author Topic: Beta Spider 2000 engine rebuild/refurb  (Read 48740 times)
0 Members and 1 Guest are viewing this topic.
mangocrazy
Legendary Member
******
Offline Offline

United Kingdom United Kingdom

Posts: 1351


Graham Stewart


« Reply #300 on: October 06, 2023, 08:04:02 PM »

The one time that I replaced a Beta head I fitted the exhaust manifold first. Isn’t that the easy way?

Probably so with the standard exhaust manifold, but mine is an Ansa/CSC that has been cut and shut. This is what it looks like. The manifold to head aren't the problem; it's bolting up the two flanges where the pipes have been cut (ironically to make fitting easier) with very little space around it and lying with your nose brushing the sump...





* DSCF1540.JPG (100.33 KB, 490x734 - viewed 227 times.)
« Last Edit: October 06, 2023, 08:06:26 PM by mangocrazy » Logged

1980 Lancia Beta Spider 2000 (S2FL)
2002 VW Transporter T4
2017 KTM Duke 690R
2008 Aprilia SL1000 Falco
1992 Ducati 888 SP3
1988 Honda VFR750F
1980 Yamaha RD350LC
Neil-yaj396
Legendary Member
******
Offline Offline

Posts: 1927


1979 1300 Coupe


« Reply #301 on: October 07, 2023, 01:56:02 PM »

The one time that I replaced a Beta head I fitted the exhaust manifold first. Isn’t that the easy way?

Probably so with the standard exhaust manifold, but mine is an Ansa/CSC that has been cut and shut. This is what it looks like. The manifold to head aren't the problem; it's bolting up the two flanges where the pipes have been cut (ironically to make fitting easier) with very little space around it and lying with your nose brushing the sump...





Realised that this must be the case just after my post. Good work getting that fitted in with no car lift for sure…..
Logged
mangocrazy
Legendary Member
******
Offline Offline

United Kingdom United Kingdom

Posts: 1351


Graham Stewart


« Reply #302 on: October 08, 2023, 09:41:14 PM »

Well I did try, but in the end I ran out of time. When you're getting ready to exit a holiday home for best part of 5-6 months there are so many little tasks that need doing; I'm sure Peter will bear me out on that. Anyway, everything that now needs to be done in the build up to (hopefully) getting the car running again is now a one person job. The bonnet is back on and most of the jobs at the front of the engine are completed, and I reckon there are 2-3 hours of work needed to get it running, but I just don't have that 2 or 3 hours spare. The engine has new oil, but not coolant yet. Here's a photo of the engine bay as it will stay until spring 2024:



* DSCF3900.JPG (614.28 KB, 1413x993 - viewed 202 times.)
Logged

1980 Lancia Beta Spider 2000 (S2FL)
2002 VW Transporter T4
2017 KTM Duke 690R
2008 Aprilia SL1000 Falco
1992 Ducati 888 SP3
1988 Honda VFR750F
1980 Yamaha RD350LC
peteracs
Administrator
Legendary Member
******
Offline Offline

United Kingdom United Kingdom

Posts: 3985


Peter Stokes


« Reply #303 on: October 09, 2023, 09:22:19 AM »

Hi Graham

I can agree, last few days can be busy.

Getting house ready for long layoff in winter does take some work. Not sure of your setup, we are quite fortunate with ours now. All building/restoration work was finished pre Covid, also our house is just the house with a small lean to at the side. Main jobs are cutting back the shrubs, last grass cut (we have very little this year as has been so dry), then spend one of the last days on final clean and pack. Morning of leaving is early up to get any chilled stuff packed, put away last items such as Karen’s buggy and the. Final drain down of water. Again fortunate as we only have wood fires so no heating system to bother with.

All in all it is quite relaxed for us now having done it for many years, initially was quite a stressful leaving day. One thing which has reduced that is Eurotunnel’s flexibility in terms of which train you actually catch. Away from peak times they just put you on the next train going regardless of your ticket number. A very sensible and flexible system which allows for late or early arrivals.

Peter
Logged

Beta Spyder S2 pre F/L 1600
Beta HPE S2 pre F/L 1600
mangocrazy
Legendary Member
******
Offline Offline

United Kingdom United Kingdom

Posts: 1351


Graham Stewart


« Reply #304 on: October 11, 2023, 01:52:19 PM »

Hi Peter,

Yes, as the trips roll by you do get into a routine. I have an exit checklist that I tick off, which helps a lot. Having a cat that tries to hide in a still fairly disorganised old house when it senses we're moving adds to the hassle. Back home now, and while the journey throughout the whole of France was under cloudless blue skies, we've returned to grey and damp.

Plus ca change...   Cheesy

Graham
Logged

1980 Lancia Beta Spider 2000 (S2FL)
2002 VW Transporter T4
2017 KTM Duke 690R
2008 Aprilia SL1000 Falco
1992 Ducati 888 SP3
1988 Honda VFR750F
1980 Yamaha RD350LC
peteracs
Administrator
Legendary Member
******
Offline Offline

United Kingdom United Kingdom

Posts: 3985


Peter Stokes


« Reply #305 on: October 11, 2023, 04:05:35 PM »

Hi Graham

Last off topic post, promise, but one of the first things wife did was checklist for leaving, she is the organised one, not me!

Weather here has been unreal for October, another day of no clouds and up to 30 degrees, due to change over the weekend thankfully a bit cooler. Have been here for nearly 4 weeks and one day of rain in an area that normally has plenty this time of year.

Peter
Logged

Beta Spyder S2 pre F/L 1600
Beta HPE S2 pre F/L 1600
Pages: 1 ... 14 15 [16]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.21 | SMF © 2015, Simple Machines
SMFAds for Free Forums
Valid XHTML 1.0! Valid CSS!