Visited John and the car yesterday and was presented with the usual monthly bill, which was sort of good news in that work has been progressing, did not bother with photos as all bits and pieces of progress.
They have finished all the metalwork which included repairs to the doors amongst other small parts. Also repaired the front corners of the bonnet, not welded as did not want to run the risk of warping it, so combination of epoxy and fibreglass, these are only small repairs so not structural, but complete the look. As the bonnet was dipped, any adhesion between the skin and the supporting structure is no longer there, so some adhesive has to be introduced to bring the bonnet back to a single solid unit which apparently is a bit of not too little, not too much job……
Various areas of the body, doors and bonnet have started the long road to filling, flatting, filling again etc. Will probably wait now until the New Year to visit again, but really happy with the progress, just need to get my finger out to get the rest of the running gear finished ready for reassembly.
Peter